 |
Project is
Approved from Uttarakhand Govt.
|
|
|
|
|
|
Project Approved for Loan |
|
 |
|
85%
Loan is Available @ 9.5%
(for eligible Person) |
|
Property in Dwarka
search property in Delhi
|
|
|
|
|
|
|
|
Dehradun Flats Key Plans-
|
| |
|
Key Plans
- |
 |
| |
Click Here for
large view |
|
Project
Status |
Project
Features |
|
• Total Land =
12.5 Acres |
• Children Park
with Slides, See-Saws |
|
• Number of Flats
= 432 |
• Joogging Track
|
|
• Number of Floor
= G+4 |
• Shopping Mall,
ATM |
|
• Location = NH 72
Haridwar Road |
• Two Swimming
Pools, GYM With |
|
(Very Near of
Indian Institute of Petroleum) |
• Latest
Equipments, Badminton Courts |
| |
|
Floor Plans for flats in Dehradun -Uttarakhand (Uttaranchal) |
|
2 Bedroom
Apartments 1200 Sq. Ft. |
2 Bedroom + Study
Room Apartments 1500 Sq. Ft. |
3 Bedroom + Study
Room Apartments 2000 Sq. Ft. |
|
 |
 |
 |
|
Click on the Images for Large View and
zoom for Extra Large |
|
|
|
|
|
location Plan:
Main NH-72, Dehradun, Haridwar High Way,
Dehradun, Uttarakhand, Uttaranchal (Vidoli,
Mokham Pur)
|
 |
| |
Click for Large View & zoom for extra large
|
|
|
• 6.5 Kms from
Rajpur Road |
• Opp. Indian
Institute of Petroleum |
|
• 32 Kms from
Haridwar |
• 17 Kms from
Jollygranty Airport |
|
• 52 Kms from
Roorkee |
• 35 kms from
Mussoori |
|
|
|
|
|
|
|
|
Interior:
• Wooden Laminated
/ Katni marble flooring in all bedrooms
• Vitrified tiles flooring in drawing, dining and
kitchen
• Anit skid tiles in bathrooms and balconies
• Woodwork in all bedrooms
• complete modular kitchen with electric chimney
• pleasing plastic emulsion paints
• public address / channel music systems in common
areas for security
• broadband connectivity
• cable connection
• voice exchange system at the main door...and much
more.
|
|
|
|
|
|
|
|
|
Preferential Location Charges
(PLC):
• PLC - Corner Rs. 15/-Sq. Ft.
• PLC Ist Floor Rs. 35/-Sq. Ft.
• PLC 2st Floor Rs. 25/-Sq. Ft.
Cash Down Payment Discount
= 12%
Construction Linked Payment
Plan
Booking Amount = 5% of BSP
with in 30 Days = 10% of
BSP
With in 60 Days of Booking
= 10% of BSP + 50% of PLC
+ 50% of Additional Charges
With in 90 Days Booking = 10% of BSP
On Start of Excavation = 10% of BSP
On Start of Plinth Level 10% of BSP
On Completion of Stilt = 5% of BSP + 25% of
Addition Charges
On Start of Ist Floor Roof =
5% of BSP
On Start of IIst Floor Roof =
5% of BSP
On Start of IIIst Floor Roof =
5% of BSP
On Start of IV Floor Roof =
5% of BSP
On Start of Internal / Extranel Plaster =
5% of BSP
On Start of Flooring =
5% of BSP
On Start of Land Scaping and other Development =
5% of BSP + 25% Addition
Charges + 50% Balance PLC
On of Offer
Possession -
5% of BSP
Possession
- May 2009
Notes:
Registration Charges, Services Taxes, or any other
Taxes impose by the Govt. Body shall be extra.
|
|
|
|
|
|
|
|
Contact Us:-
|
|
|
|
Organization |
: |
Uttara
Housing and Construction |
|
Contact
|
:
|
Utara
housing Team |
|
Mail |
|
uttarahousing@gmail.com |
|
|
|
|
|
|
|
|
|
|